In May 2022, a DN1200 emergency water supply pipeline in Suining City, a key infrastructure project for ensuring the safety of urban residents' water supply and responding to emergencies in water supply, undertook the core water transmission function of the region. Over time, the pipeline developed hidden dangers such as pipe wall corrosion, joint sealing failure, and localized foreign object accumulation. If not promptly investigated and repaired, these could affect water quality and transmission efficiency, and even lead to water supply interruptions. Therefore, a comprehensive inspection was urgently needed to establish a complete pipeline health record, providing a basis for subsequent accurate repairs. However, the project faced a dual challenge: First, the pipeline was a single, long-distance linear structure, requiring a single inspection to cover an unusually long distance. Traditional inspection equipment had limited cable length, power, and other factors, making it difficult to complete a single long-distance pipeline inspection. Second, the pipeline's internal environment was complex; in some sections, the water depth was sufficient to submerge the camera components of traditional inspection equipment, leading to blurred images or equipment malfunctions. Ordinary equipment was prone to jamming or stalling, and traditional equipment was susceptible to signal interference during long-distance transmission, resulting in image quality degradation and difficulty in accurately identifying pipe wall defects, failing to meet the required inspection accuracy. The inspection work was once in a predicament.