Case Study: Boming Weixing Ink Technology's DN1800 Ultra-Large Diameter Pipe Repair Project a Complete Success
Application Cases

Case Study: Boming Weixing Ink Technology's DN1800 Ultra-Large Diameter Pipe Repair Project a Complete Success

Recently, Bomingwei Technology's wholly-owned subsidiaryXingmo TechnologyWe provided DN1800 large-diameter UV-CIPP repair hoses for a pipeline renovation project in the central urban area of ​​Shanghai, along with Bomingwei's self-developed UV curing repair equipment, which helped the project successfully complete the trenchless repair of ultra-large diameter drainage pipelines.

「  Project Background 」

Recently, Bomingwei Technology's wholly-owned subsidiaryXingmo TechnologyWe provided DN1800 large-diameter UV-CIPP repair hoses for a pipeline renovation project in the central urban area of ​​Shanghai, along with Bomingwei's self-developed UV curing repair equipment, which helped the project successfully complete the trenchless repair of ultra-large diameter drainage pipelines.

「  Technical challenges 」

This timeDN1800Large-diameter pipe repair places stringent requirements on materials, equipment, and processes.
High material difficulty

Large diameter + large wall thicknessWide-width weaving, resin impregnation, uniformity, waterproof outer membrane lamination, etc.The requirements are extremely high; ordinary materials are prone to delamination, lack of adhesive, and insufficient local wetting.

 

Curing control is difficult

Large-diameter pipes have higher requirements for UV light intensity and coverage. Precise control of light intensity, temperature and travel speed is necessary to avoid insufficient curing or overheating damage, which would affect the quality of the repair.

 

Harsh on-site working conditions 

The city center is plagued by heavy traffic and limited work space. Located under an overpass, construction is only permitted for short periods from 9:00 PM to 6:00 AM the following day, putting significant pressure on the project schedule and safety management.

 

Large-diameter pipe repair procedures are complex.

Large diameter pipes need to be prepared in advanceHigh-pressure airbagSealing and stopping water; the material discharge well opening is too small and needs to be enlarged and the top of the well chamber needs to be dismantled, and the pipeline to be repaired continues to be invaded by external water, requiring additional water pumping, which increases the number of procedures and lengthens the construction period; at the same time, the requirements for the hose to be pulled into place, inflated and fitted, and the stability control of the whole process are extremely high.

「  定制化方案  」

 

To meet the high standards required for this project, Xingmo Technology provided...Self-developed closed-loop solution for the entire supply chain:

①

Self-developed large-diameter special pipeUVCIPP hoseuseExtended synchronous vacuum impregnation processHigh-strength fiberglass composite customized resin, combined with a reinforced waterproof outer membrane, enhances material toughness while ensuring waterproof performance under conditions of large diameter and thick wall.No bubbles, no dry layer, no separationMechanical and corrosion resistance properties fully meet standards.。

②

useBomingwei TechnologySelf-developedPhoenix-180C High PowerUltraviolet lightCuring and Repair EquipmentMatching2350 Electric Telescopic Light ChainIt also features imported generators, providing ample, stable, and reliable power. During construction, [the following is likely a separate, unrelated sentence:] ...temperature,Light intensityspeed of travelconductReal-time monitoring throughout the processThis ensures uniform curing and one-time molding. The light chains and light clusters are arranged in parallel, allowing for close-to-the-pipe operation, resulting in more thorough irradiation coverage and more uniform curing.

③

End-to-end technical supportSpecialized large-diameter knots are used to ensure a reliable and airtight seal at the joints; throughout the entire operation...Continuous pressure stabilization and pressure maintenanceThis ensures the hose fits tightly against the old pipe wall, eliminating voids, wrinkles, and springback, guaranteeing a dense and uniform lining after curing. From pipe pretreatment, material preparation, inflation and pressure testing, to curing and quality acceptance, the technical team is on-site throughout the entire process to ensure...One-time well entry and one-time solidification qualification.Complete tasks efficiently within tight work hours.

"Benchmark Significance"

 

The successful repair of the DN1800 in this first-tier city marks a significant achievement for Xingmo Technology.extra-large diameter pipeUVCIPP Materials and ConstructionThe field has reached a new level:

▶ VerificationDN150–DN2400 Total pipe diameterReliability of self-developed material systems

▶ Strengthen integrated delivery capabilities of materials, equipment, and technical services

▶ Provides a replicable benchmark case for trenchless repair of ultra-large diameter main pipelines.

In the future, Xingmo Technology will continue to focus on the field of trenchless repair materials, serving key municipal projects across the country with higher standards, more stable quality, and stronger delivery, and helping to upgrade urban underground pipe networks to a high standard.

(After repair)